Demand & Supply

Supply Chain Control Tower

End-to-end visibility from supplier to consumer. AI watches every node and lane, detects disruptions early and proposes the move that protects service at lowest cost.

1What is happening?
OTIF 93.4%; 6 shipments delayed; Bandung DC service level 86%.
2Why?
Promo demand spike in West Java plus an SUP-02 bottle delay into Plant B.
3What happens next?
Plant B Line 1 hits 96% in October; Bandung stockout risk 81%.
4What should we do?
Transfer Surabaya → Bandung, dual-source bottles, re-sequence Line 1.
5If we act?
Service level 86% → 96% at Bandung Estimated

Network health

End-to-end flow
Supplier → plant → distribution centre → distributor → retailer → consumer · border colour = risk level · click a node to explain
Low riskMedium riskHigh riskCritical risk

AI detections

Supply disruptionHigh
SUP-02 HDPE bottles late
OTIF 81%, lead time +6 days; 58% chance of bottle shortage at Plant B in October.
74%
INS-12 →
Demand spikeHigh
FreshHome Surface Cleaner +18%
Early rainy season and search trend lift October demand across all regions.
84%
INS-03 →
Production bottleneckMedium
Plant B Line 1 at 96% in Oct
Home-liquids line saturates with the FreshHome spike; no flex for SUP-02 delays.
78%
INS-17 →
Logistics delayMedium
Medan sea freight +2 days
Jakarta → Medan vessel schedule slipped; 2 shipments delayed, Medan DC cover still 20+ days.
80%
Why? →
Inventory imbalanceCritical
Bandung 6 days vs Surabaya 43 days
Lumi Baby Lotion 200ml: 81% stockout probability in 8 days at Bandung DC.
87%
INS-01 →
Network map
Plants (squares), DCs (diamonds), distributors (circles) · lanes coloured by risk · dashed blue = recommended transfer
Recommended transferCriticalHighMediumHealthy lane
Surabaya DC → Bandung DC: 2,500 cartons (30,000 units) · 690 km · cost IDR 19M · revenue protected IDR 908M Estimated
Inventory by DC
Value at cost · days of cover · click for Inventory 360
Lead time by lane
Days · planned vs actual (last 4 weeks)
PlannedActual
Demand vs capacity · next 3 months
Planned line utilisation incl. AI demand forecast · ≥95% = no flex
Predicted
Shipments in transit
Plant → DC, DC → DC and DC → distributor · includes AI-proposed transfer
1 proposed
15 rows
ShipmentLaneSKUUnitsModeETAStatus
TRF-PROPOSEDSurabaya DC → Bandung DCLumi Baby Lotion 200ml30,000Road02 OctProposed
SHP-24081Plant A → Jakarta DCLumi Baby Lotion 200ml42,000Road29 SepOn time
SHP-24082Plant A → Bandung DCLumi Baby Lotion 100ml26,000Road30 Sep+1dDelayed
SHP-24085Plant B → Surabaya DCFreshHome Surface Cleaner 800ml54,000Road29 SepOn time
SHP-24087Plant B → Jakarta DCFreshHome Dishwashing Liquid 780ml88,000Rail01 OctOn time
SHP-24090Jakarta DC → Medan DCVitaCare Body Wash 450ml36,000Sea06 Oct+2dDelayed
SHP-24091Jakarta DC → Medan DCPureNest Antiseptic Liquid 250ml21,000Sea06 Oct+2dDelayed
SHP-24093Plant C → Semarang DCVitaCare Bar Soap 110g120,000Road29 SepOn time
Page 1 of 2
Supply chain risk register
AI-detected risks across the chain · ranked by severity